News ·
Bridge Inspection on the Gori-Khashuri Road Completed
A three-week inspection found two piers in need of repair before the winter season.

The inspection covered four bridges on the stretch between Gori and Khashuri, using a combination of visual survey and concrete testing.
Two piers on the older bridge showed surface corrosion on the reinforcement and will need repair before winter traffic increases.
A full repair proposal has been submitted to the regional roads authority, with work expected to start in spring 2027.